S.No. | Nature Of Work | Name of Firm | Date Of LOA | Date Of Completion | Contract Amount |
---|---|---|---|---|---|
1 | Caring out detailed engineering survey, including leveling, alingment design, GAD of Bridges, building etc. survey of electrical &UG utilities preparation of ESP, BOQ and other ancillary work in connection with Development of Railway Yard in Maruti Plan at Manesar including proposed siding from Manesar station of HORC | Elite Consultant | 23.06.2020 | 07.08.2020 | 5,63,000.00 |
2 | Procurement of total station,auto level, digital range finder for HRIDC | Sigma Survey Instruments | 07.07.2020 | 22.07.2020 | 4,34,240.00 |
3 | Conducting detailed engineering survey, final location survey, preparation of L section and cross sections, preparation of ESP, SIP, OHE scheme, site selection and demarcation of bridges, preparation of GODs, preparation of Land acquisition documents, preparation of detailed estimate of various compoinents and other miscellaneous work in connection with alternate alignment of Hours between Ch: 15 KM ( Chainage of DPR Alignment) and 30 KM (Chainage of DPR alignment) for approximately 18 KM | S.M. Consultants | 14.07.2020 | 28.08.2020 | 13,44,934.00 |
4 | Exploring alternate alignments, final location survey, Geological mapping, Geo Technical investigation, detail design of tunnel & its approaches including Viaduct if any and other ancillary work in Sohna-Manesar Section of HORC Project | S.M. Consultants | 14.08.2019 | 15.12.2020 | 69,33,239.00 |
5 | Validation of Surveydata by conducting detailed topographical survey, establishment of additional control points, pegging of finalized alignment on ground, picking up of cross levels at regular interval, prepation of L section & X sections for main line from CH 46500 to 52500 etc | S.M. Consultants | 22.09.2020 | 5,28,894.24 | |
6 | Detailing of EHT line crossing (above-33 kv), its locations height of the tower, vertical clerance of lowest condcutor fro Rail Level circuit details. System voltage, comments on modification etc. | Anvir Tech Ventures Pvt. Ltd. | 22.10.2020 | 22.01.2021 | 4,42,980.00 |
7 | To carrry out environment & social impact assesment study including preparation & submission of report in connection with HORC project (143.93) from palwal to Sonipat including connections to the existing railway network. | Overseas Min - Tech Consultants | 17.11.2020 | 17.04.2020 | 14,65,685.00 |
S.No. | Nature of Work | Name of Firm | Date of LOA | Date of Completion | Contract Amount |
---|---|---|---|---|---|
1 | Providing consultancy services for Feasibility Study and preparation of detailed project report in ocnnection with development of Palwal to Panipat Rail Cooridor by passing Delhi area by linking Asaoti-Patil-Farukhnagar-Jhajjar by new Electrified Double Line | Aarvee Associates Architects Engineers & Consultants Pvt. Ltd. | 05.01.2019 | 14.05.2019 | 1,07,97,250/- Revised- Rs. 1,29,07,790/- |
2 | Consultancy services to HRIDC for assistance in Planning and Implementation of Railways Infrastructure Project in the state of Haryana | Ernst & Young LLP | 09.03.2020 | 09.03.2021 | 75,60,000.00 |
3 | Consultancy services to HRIDC for Planning and implementation of Railway Projects in Haryana State | Pricewaterhouse coopers Pvt. Ltd | 03.06.2020 | 15,00,000.00 |